50M 200T Bridge Girder Erection Machines Design

50M 200T bridge girder erection machines design Design features include: 1. Reliable performance a) Apply the latest separate pinned structure of triangular space truss to main girder, so as to improve the stiffness and strength of whole crane. b) Main girder is made of Q345 high strength steel,...

Send Inquiry

Product Details

50M 200T  bridge girder erection machines design

 

Design features include:

1. Reliable performance

a) Apply the latest separate pinned structure of triangular space truss to main girder, so as to improve the stiffness and strength of whole crane.

b) Main girder is made of Q345 high strength steel, and melt into the latest design to ensure the main girder can work under high strength mode safely.

c) The launching crane is pioneering in continuous one time operation during bridge launching progress in China. It is of the most complete function launching crane for single machine domestically.

d) Compared with similar products from other supplier, launching crane have its unique design concept to the most difficult hole-span during bridge erection, in the way of laying side beam. So, it is safer to operate under high difficult and risk condition.

e) Powerful front, middle beam and three transom crane connect together to ensure transverse stability during bridge erection fully.

f) There is separate stroke switch control to each traveling mechanism, so as to decrease mutual collision between each traveling mechanism.

g) Overload resistance system: there is high performance weight limiter on two sets of trolleys, so if the lifting girder is overloading, the weight limiter will stop it at once.

h) There are normally three legs from other supplier. But we have four legs, including one front leg, one middle leg, one rear leg and one temporary leg.

i) Apply inner shrink leg to one time erect side beam in position and have more safety.


2. More powerful corrosion resistance

a) Strictly execute standard painting process to ensure blasting and painting quality.

b) Apply H steel enclosed section for main girder chord. Web chord is made by customized square tube to realize enclosed welding, which can avoid inner rust.


3. Higher working efficiency

a) There is traveling rail together with main girder, trolley and longitudinal crane. So, it is no need to lay traveling rail more. In this way, a lot of auxiliary materials are saved and production time is also saved.

b) The bridge erection crane has higher working efficiency, with 6~8 pieces girder erection every day, based on enough concrete plate supplying, skilled operator and good condition at site.


4. More flexibility

a) It is symmetrically designed. Two way girder erections can be realized without split and slewing at original place.

b) Use one meter of hydraulic jack for front leg and rear leg. This design improves working efficiency, safety and flexibility largely.

c) Erect skew bridge by inclined way. Apply rotary face flange to connect each mechanism and structure, to erect 0~45°skew bridge. Side beam can be positioned one time for over 320m curve radius bridge.

5. Easier assembly and disassembly

a) Each structure is connected by pins and bolts to facilitate assembly.

b) Normally one set of launching crane can be assembled within 7days.

6. Plentiful experiences in this field

a) Our chief engineer Dr. chen is professional and very famous in China to design launching cranes.

b) The bridge launching girder is one of the highest market shares manufacturers in China, especially in Yangtze River Economic Delta, you can see our products everywhere.


MCJH50/200

MCJH40/160

MCJH40/160

MCJH35/100

MCJH30/100

Lifting capacity

200t

160t

120t

100t

100t

applicable span

≤55m

≤50m

≤40m

≤35m

≤30m

applicable skew bridge angle

0-450

0-450

0-450

0-450

0-450

trolley lifting speed

0.8m/min

0.8m/min

0.8m/min

1.27m/min

0.8m/min

rolley longitudinal moving speed 

4.25m/min

4.25m/min

4.25m/min

4.25m/min

4.25m/min

cart longitudinal moving speed    

4.25m/min

4.25m/min

4.25m/min

4.25m/min

4.25m/min

cart transverse moving speed

2.45m/min

2.45m/min

2.45m/min

2.45m/min

2.45m/min

transportation capacity of bridge transport vehicle

100t X2

80t X2

60t X2

50t X2

50t X2

heavy load speed of bridge transport vehicle

8.5m/min

8.5m/min

8.5m/min

8.5m/min

8.5m/min

bridge transport vehicle return speed

17m/min

17m/min

17m/min

17m/min

17m/min

 