How to prevent the clogging of the holes on the parts of the bridge crane

- Jan 10, 2018 -

How to prevent the clogging of the holes on the parts of the bridge crane?


There are a lot of bridge crane on the large and small parts, which are a large part is provided with a hole, if because of various reasons that these channel obstruction, will cause a series of serious consequences, is very unfavorable for the safe and stable operation of the bridge crane. But a lot of people are not aware of the importance of this, so we want to take this opportunity to remind you.


After careful observation, it is found that the channels on the parts of the bridge type cranes are really quite a few, which are the functions of drainage, exhaust and dust discharge. If these channels are blocked, they will not only fail to perform their original functions, but also lead to failure or even damage to the operation of the related mechanisms or systems of bridge cranes.


Since this is a bridge crane for security risks, so we must prevent pore blockage, it also depends on the daily maintenance and repair, should always check the patency of the canal, to avoid clogging, so as to ensure the bridge crane maintain good running long.

2ee76fb08d68afa.jpg

Related Industry Knowledge

Related Products

  • Rail Type Lifting Platform Hydrualic Stationary Lift Platforms
  • Modern Crane 150T Hydraulic Marine Travelift Boat Sling For Sale
  • Hydraulic Port Jib Crane
  • New Design 30T A-Type Double Girder Gantry Crane with Hook
  • Double Girder Semi Portal Crane Semi Gantry Cranes
  • 250T Hydraulic Rubber Boat Lifting Cranes, Mobile Yacht Boat Hoist Lifting Crane